PM Modi inaugurates Chennai Metro Rail Phase-I; hands over Arjun Main Battle Tank to Indian Army – The Economic Times Video

[ad_1]

Prime Minister Narendra Modi inaugurated the Chennai Metro Rail Phase-I extension on February 14. The total project cost Rs 3770 crores. This 9.05 km long extension will link North Chennai with the Airport and Central Railway Station. PM Modi also inaugurated the fourth Railway line between Chennai Beach and Attipattu. PM also handed over the Arjun Main Battle Tank (MK-1A) to Indian Army Chief General MM Naravane on February 14. The state of the Arjun Main Battle Tank MK-1A has been indigenously designed, developed and manufactured by CVRDE, DRDO along with 15 academic institutions, 8 labs and several MSMEs. PM Modi is in poll bound state Tamil Nadu.



[ad_2]

Source link

Be the first to comment

Leave a Reply

Your email address will not be published.


*